SyntaxFlow

Metalwork · Railings

Metal railing calculator

A 3 m run, 1 m high, with posts and handrail in 40 × 40 × 2 square tube and 12 mm square bar balusters at a gap of 100 mm at most, takes 24 balusters in 2 bays: 29.64 m of steel weighing about 44.5 kg. Change the sizes and the profiles: the calculator spaces the balusters evenly, gives the cut list and opens it in the bar optimizer.

The run
Outside to outside, along the floor.
Floor to the top of the handrail. Check the minimum height in your country's code.
The widest opening your code allows. Spain: 10 cm in dwellings (CTE DB SUA 1, 3.2.3). Elsewhere, check the code in your country.
Floor to the underside of the bottom rail. Keep it under the largest gap too.
Post centre to post centre. This page does not check the strength of the railing or its fixings.
6 m in Europe; 6.10 m (20 ft) in Mexico and the US.
The profiles
—
Balusters
—
Clear gap
— mm
Profile
— m
Weight
— kg
99.73000 mm1000

Cut list

ProfilePieceLength (mm)Qty

What the codes say

This page does not know the code where you build: type the largest gap and the height it asks for. As an example of what one code says, Spain's CTE DB SUA (SUA 1, section 3.2) asks for a barrier at least 0.90 m high where the drop is up to 6 m and 1.10 m beyond, measured from the floor or, on a stair, from the pitch line; and, in dwellings, nursery schools and the public areas of shops and public venues, no opening a 10 cm sphere can pass through (15 cm in the public areas of other buildings). Check the code in your country.

How it is worked out

bays = ⌈(length − post width) / largest post spacing⌉ clear = (length − posts × post width) / bays each bay, between posts balusters= ⌈(clear − s) / (baluster + s)⌉ per bay s = largest gap gap = (clear − balusters × baluster) / (balusters + 1) baluster = height − handrail − gap under − bottom rail weight = Σ metres × kg/m of the profile (section × density)

For the run above: (3000 − 40) / 1500 gives 2 bays and 3 posts, and each bay is (3000 − 3 × 40) / 2 = 1440 mm clear. 12 mm balusters at 100 mm at most: ⌈(1440 − 100) / 112⌉ = 12 per bay, at (1440 − 12 × 12) / 13 = 99.7 mm. Each baluster is 1000 − 40 − 50 − 40 = 870 mm. The 40 × 40 × 2 tube is 1600 − 36² = 304 mm², 304 × 7850 / 10⁶ = 2.386 kg/m; the 12 mm bar is 144 mm², 1.130 kg/m. Weight: 8.76 m × 2.386 + 20.88 m × 1.130 = 44.5 kg. The sections are sharp-cornered, as in the metal weight calculator: a rolled tube with round corners weighs a few per cent less.

What this page does not do

Questions people ask

How many balusters does a railing need?
Divide each bay's clear width minus the largest gap by the baluster width plus the gap, and round up: a 3 m run in 2 bays of 1440 mm with 12 mm balusters at 100 mm at most needs 12 per bay, 24 in all, at 99.7 mm.
How far apart should balusters be?
As far as the code where you build allows, no more: Spain's CTE DB SUA 1 (3.2.3) allows no opening a 10 cm sphere passes in dwellings. Check the code in your country and type its figure as the largest gap.
How much does a steel railing weigh?
The 3 m run above, in 40 × 40 × 2 tube with 12 mm square balusters, weighs about 44.5 kg, 14.8 kg per metre of run.