Glass · Quotes
How to price a glass job
Measure each opening, price the glass per m² with its edges and waste, look at how many sheets it uses, add labour, travel and fitting, set your margin and send the quote with your brand. Each step has its free tool on SyntaxFlow.
The six steps
| Step | What to do | Tool |
|---|---|---|
| Measure carefully and write it down | Each opening with width, height, quantity and glass type, and the clearance the frame needs. A measuring mistake is expensive: cut glass does not stretch. | Measurement sheet |
| Price the glass per m² with waste | The price of each glass per m², plus edges, holes or notches, and the part of the sheet that is not used. The optimiser says how many sheets the job takes. | Glass price calculator |
| Look at the sheets it uses | The cutting plan gives the whole sheets you buy: with it, the waste is real, not a guessed percentage. | Glass cutting optimiser |
| Add labour, travel and fitting | Shop and site hours, the journey and the fitting materials (silicone, setting blocks, beads). | Job costing |
| Set your margin | On the total cost, the margin your shop needs to cover overheads and earn. Job costing keeps it apart from the cost so it shows. | Job costing and margin |
| Send the quote with your brand | The lines, the VAT, the validity and the terms in a document with your logo, ready to send or sign. | Estimate |
This guide gives no prices: every shop has its own. The tools work with the ones you enter.
Two costly mistakes
- Guessing the waste. A fixed 10 % falls short on jobs of large panes and is too much on jobs of many equal ones: use the real sheets of the cutting plan.
- Forgetting edges and holes. On shower screens and tables they can cost as much as the glass.
Questions people ask
- How do you work out the price of a pane of glass?
- Square metres times the price per m² of that glass, plus edges, holes and notches, plus the part of the sheet that is not used.
- What margin goes on a glazing quote?
- Whatever your shop needs to cover overheads and earn; there is no general figure. Job costing keeps it apart from the cost so you see it.
- How do you work out glass waste?
- With a cutting plan: the whole sheets the job uses minus the m² of the panes. More reliable than a fixed percentage.